[Abstract] In order to help everyone prepare for the BIM exam, the editor of the Global Network School compiled the daily practice questions and answers for the daily practice of the BIM exam, which are arranged as follows for your reference! For more test preparation content, please pay attention to the Global Network School BIM channel, daily A little practice, a little harvest every day, a little growth every day, more exciting every day, and I wish everyone a smooth exam.

Multiple choice

1. [Single-choice question] The following applications for the characteristics of BIM visualization and massive databases in enterprises do not include ().

A. Scheme comparison, optimized design

B. Collision inspection, reducing rework

C. Virtual construction, effective collaboration

D. Reduce costs and increase efficiency

[Answer] D

[Analysis] Does not include reducing costs and increasing efficiency.

2. [Single-choice question] The following statement about the establishment of BIM model is wrong ().

A. The general contractor deepens the design drawings, establishes a BIM model at the beginning of the project, and carefully checks and improves the drawings.

B. Design drawings, equipment information and BIM creation data provided by the construction unit

C. Check the data provided by the design, organize the design and the representative of the owner to hold a BIM model and related data corporate transfer meeting

D. Improve the BIM model based on the design and the owner's supplementary information

[Answer] B

[Analysis] The design unit provides design drawings, equipment information and data required for BIM creation.

3. [Single-choice question] The correct statement about the maintenance in the construction process is ().

A. The general contractor maintains the BIM model during the construction phase to ensure that the construction proceeds smoothly and is constantly updated to ensure that the information in the BIM model is correct

B. According to the actual progress of the construction site, timely modify and update the BIM model

C. Modify and improve the BIM model in time according to the design changes and deepening design during the construction process

D. According to the owner's requirements for the construction period nodes, the BIM model of the upper designer in accordance with the construction progress and design changes

[Answer] D

[Analysis] The maintenance content during the construction process includes:

The general contractor maintains the BIM model during the construction phase to ensure that the construction proceeds smoothly and is constantly updated to ensure that the information in the BIM model is correct.

Modify and improve the BIM model in time according to the design changes and deepening design during the construction process.

According to the actual progress of the construction site, timely modify and update the BIM model.

According to the owner's requirements for the construction period node, a BIM model consistent with the owner's construction progress and design changes is reported.

4. [Single-choice question] What is wrong about the data security management of BIM is ().

A. BIM team uses open Internet to facilitate information exchange with the outside world

B. The BIM team performs strict division of labor, and data storage sets access and modification permissions according to division of labor and different user levels.

C. Encrypt all BIM data, set up an internal communication platform, and encrypt platform data to prevent information leakage

D. The BIM workgroup's computers are all equipped with password locks for protection. The BIM workgroup arranges offices separately, and no one can enter without permission.

[Answer] A

[Analysis] The BIM team uses an independent internal LAN to block the connection to the Internet.

5. [Single-choice question] The following statement about deepening the coordination principle of design organization is wrong ().

A. The division of labor for deepening design is based on the principle of "who constructs and who deepens"

B. The general contractor, the main mechanical and electrical contractor, and each subcontractor are responsible for all the professional deepening design work within their contracted (direct construction) scope, and bear all their technical responsibilities. Exempt

C. The general contractor is responsible for compiling comprehensive plans such as comprehensive floor plans, template drawings, etc. according to the professional deepening design of architecture, structure, and decoration.

D. If there is a special agreement in the contract, it depends on the actual situation

[Answer] D

[Analysis] If there is a special agreement in the contract, the contract will be implemented.

"For the mountain man, it is based on a pile of soil, with thousands of feet; the well digger rises from a three-inch ridge, so as to be ten thousand feet deep," insisting on practice will yield good results. The above is the daily practice of BIM exam brought to you by Global Network School. I hope everyone will stick to the study every day. ”领取自主学习资料。 For more details of the exams for the eight major members, please pay attention to the Global Online School. You can also click on the " Free Download " button below to get your self-learning materials.

share to: Edit: Gong Mingwei

Bind phone number

In accordance with the requirements of the "People's Republic of China Cyber Security Law" to strengthen the real-name authentication mechanism, and at the same time to provide a more comprehensive experience of product services, please bind your mobile phone number.

Appointment made

This live broadcast is a live lesson for paid students

Please make a reservation after purchasing the course

直播、听课。 Global Online School Mobile Class App broadcast live and listen to lessons. Insta Future!

Android version

download

iPhone version

download
Global Small Over-Global WeChat Official WeChat Service Platform

Resolving problems APP download

Free live one-click lessons

Registration and other manual services

Back to top