[Abstract] In order to help everyone prepare for the BIM exam, the editor of the Global Online School compiled the daily practice questions and answers for the daily practice of the 2019 BIM exam. Every day, practice a little, harvest a little every day, grow a little a day, a more exciting day, and I wish everyone a smooth exam.

Multiple choice

1. [Multiple choice questions] The value of BIM in the construction stage for the improvement of construction technology is ().

A. Assist construction deepening design or generate construction deepening drawings

B. Simulation and analysis of construction procedures using BIM technology

C. Error, omission and defect checking based on BIM model

D. Real-time communication method based on BIM model

E. Space management based on BIM model

[Answer] ABCD

[Analysis] 1. Assist construction deepening design or generate construction deepening drawings.

2. Use BIM technology to simulate and analyze the construction process.

3. Error, omission and defect checking based on BIM model.

4. Real-time communication based on BIM model.

All four options are part of the value of BIM for technology enhancement during the construction phase.

2. [Multiple choice questions] What are the main contents of building performance analysis ().

A. Energy analysis

B. Greening analysis

C. Equipment analysis

D. Pollution analysis

E. Site analysis

[Answer] AC

[Analysis] Performance analysis mainly includes energy consumption analysis, lighting analysis, equipment analysis, and green analysis.

3. [Multiple choice questions] What are the main contents of construction simulation ().

A. Simulation and optimization of construction plan

B. Automatic calculation of engineering quantity

C. Elimination of on-site construction process interference or construction process conflict

D. Deployment of workers on site

E. Simulation of construction time

[Answer] ABC

[Analysis] The construction simulation mainly includes the following points:

(1) Simulation and optimization of construction plans;

(2) Automatic calculation of engineering quantities;

(3) Eliminate the interference of construction process or conflict of construction technology on site.

4. [Multiple choice questions] What does the post-evaluation mainly include ().

A. Goal evaluation

B. Cost evaluation

C. Impact evaluation

D. Continuous evaluation

E. Process evaluation

[Answer] ACDE

[Analysis] The content of evaluation can be divided into several aspects such as target evaluation, benefit evaluation, impact evaluation, continuous evaluation, and process evaluation.

5. [Multiple choice questions] In the process of enterprise informatization, the main task of surveying and designing enterprises is ().

A. Promote the deep integration of information technology and business management

B. Accelerate the popularization of BIM and upgrade the survey and design technology

C. Strengthening the construction of information infrastructure

D. Strengthen enterprise knowledge management and support the construction of smart enterprises

E. Strengthen the quality of construction personnel

[Answer] ABD

[Analysis] The main tasks of survey and design enterprises in the process of enterprise informatization.

(1) Promote the deep integration of information technology and enterprise management;

(2) Accelerate the popularization of BIM and upgrade the survey and design technology;

(3) Strengthen enterprise knowledge management and support the construction of smart enterprises;

The main task of the enterprise informatization of the construction unit described in option C is described in option C.

"For the mountain man, it is based on a pile of soil, with thousands of feet; the well digger rises from a three-inch ridge, so as to be ten thousand feet deep," insisting on practice will yield good results. The above is the daily practice of BIM exam brought to you by Global Network School. I hope everyone will stick to the study every day. ”领取自主学习资料。 For more details of the exams for the eight major members, please pay attention to the Global Online School. You can also click on the " Free Download " button below to get your self-learning materials.

share to: Edit: Gong Mingwei

Bind phone number

In accordance with the requirements of the "People's Republic of China Cyber Security Law" to strengthen the real-name authentication mechanism, and at the same time to provide a more comprehensive experience of product services, please bind your mobile phone number.

Appointment made

This live broadcast is a live lesson for paid students

Please make a reservation after purchasing the course

直播、听课。 Global Online School Mobile Class App broadcast live and listen to lessons. Insta Future!

Android version

download

iPhone version

download
Global Small Over-Global WeChat Official WeChat Service Platform

Resolving problems APP download

Free live one-click lessons

Registration and other manual services

Back to top